Project Scheduler

Gahanna, OH 43230

Posted: 08/16/2018 Job Number: 11475850
Integrated Talent Strategies (ITS) is seeking Project Scheduler to work in the Columbus, OH area.  This position offers a variety of great benefits, including health insurance, 401(k), and paid time off.

Responsibilities:
  • Independently lead the effort to develop and analyze schedules using Primavera Project Planner Enterprise (P6).
  • Able to plan, schedule, integrate, update, maintain, and analyze project schedules with minimal supervision.
  • When applicable, maintain security, reporting, maintenance, and daily operation of Primavera Project Planner Enterprise Software.
  • Must be self-motivated, a good communicator, and team focused individual able to competently perform current scheduling techniques and analyses on all project/outage aspects.
  • Additional duties may include developing and implementing project schedule status reports for the project management team. The candidate must be able to interface with project execution teams, architects/engineers, suppliers, contractors, and management.
  • Confirm all logic and activities support the level of detail required by the customer and meet internal department standards and guidance.
  • Ensure all logic and activities support the level of detail required by the customer and meet internal department standards and guidance.
  • Produce and maintain each job path as its own project, capable of integration into one multi-network schedule.
  • Prepare and analyze metrics reports or KPIs. Provide periodic summary level status reports as
    requested.
  • Scheduler responsible to coordinate with the PM and PC to establish original baseline budgets that are time-phased with dates from the P6 schedule.
Qualifications:
  • Bachelor Degree in a related technical field such as Engineering, Construction Management, or an Associate degree in a related technical field and /or equivalent experience.
  • 2  years’ experience as a Scheduler or equivalent project controls experience.
  • Have computer background including: knowledge of Oracle Database Systems, Windows Operating System, Microsoft Office, Primavera Project Planner Enterprise, and Indus Passport or equivalent work management data systems.
  • Experience with schedule QA/QC and financial reporting software are a plus.
  • Licenses/Certifications: Primavera/P6 certification.
  • Working towards PMP is desired.
 
About Integrated Talent Strategies (ITS) 

ITS is an international recruiting and staffing firm specializing in Engineering, Technical and Professional positions.  Founded in 1984 as a subsidiary of an engineering firm, ITS continues to remain a strategic partner for the job seeker.   

Our clients include some of the largest and most respected architectural, engineering, and manufacturing companies in business today.  Our ability to offer a wide range of services, and the flexibility to adjust to the changing needs of our clients, has allowed us to maintain a solid reputation for several decades. 

Benefits include medical, dental, and vision insurance; 401(k) with a company match; paid holidays and vacations; tuition reimbursement.  To learn more, go to www.Wehirepeople.Com or click below to directly contact your recruiter.

Send an email reminder to:

Share This Job:

Related Jobs:

Login to save this search and get notified of similar positions.